Isopropyl Alcohol (IPA) Dehydration Equipment

The integration of Distillation, Fractionation, and Membrane Separation offers a comprehensive solution for IPA purification. After fractionation, a membrane separation process serves as the final purification step, selectively removing impurities while permitting purified IPA passage.

Effective process integration hinges on optimizing operating conditions, encompassing temperature, pressure, flow rates, and membrane properties. Control systems are essential for continuous monitoring and adjustment of key parameters to ensure optimal performance.

The specific design and integration approach will vary based on the IPA purification process’s scale, capacity, and unique requirements. Detailed engineering calculations, simulations, and experimentation may be necessary to fine-tune the integration and attain the desired purification outcome.

Made To Measure Solution

Additional information

Working Medium

Isopropyl Alcohol, Mixed Solvents

Material heating method

Steam

Production Material

Stainless Steel 304, Stainless Steel 316, Stainless Steel 316L

Product moisture content

0.01%~0.1%, 0.1%~0.2%, 0.2%~0.5%

Working Capacity

1000 TPA, 10000 TPA, 15000 TPA, 2000 TPA, 25000 TPA, 3000 TPA, 30000 TPA, 4000 TPA, 40000 TPA, 5000 TPA, 52000 TPA, 600 TPA, 60000 TPA, As Per Project Demand

Power (Input)

240V, 380V, 415V, 440V

Raw Material Moisture content

1%~30%

Description

Process Design and Controlling of 99.9% Isopropyl Alcohol

How to Produce High-purity IPA of at least 99.9%?

The stringent demand for high-purity Isopropyl Alcohol (IPA) exceeding 99.9%, with moisture content below 200ppm, is paramount for pharmaceuticals adhering to regulatory standards. Deviations from these standards can result in approval process delays.

Within the realm of integrated circuits (ICs) processing, ultra-clean, high-purity chemicals play a pivotal role in cleaning and etching chip surfaces and silicon wafers. Their purity and cleanliness profoundly impact IC yield, electrical performance, and reliability.

Notably, ultra-clean, high-purity isopropanol serves as a cornerstone microelectronic chemical for cleaning and drying in semiconductor and large-scale integrated circuit processing.

Furthermore, in petrochemicals and organic synthesis, water removal stands as a critical operation for producing top-quality products and ensuring process safety. Isopropyl alcohol dehydration is indispensable in these process operations.

Further deep exploring of information by clicking here.

Additional information

Working Medium

Isopropyl Alcohol, Mixed Solvents

Material heating method

Steam

Production Material

Stainless Steel 304, Stainless Steel 316, Stainless Steel 316L

Product moisture content

0.01%~0.1%, 0.1%~0.2%, 0.2%~0.5%

Working Capacity

1000 TPA, 10000 TPA, 15000 TPA, 2000 TPA, 25000 TPA, 3000 TPA, 30000 TPA, 4000 TPA, 40000 TPA, 5000 TPA, 52000 TPA, 600 TPA, 60000 TPA, As Per Project Demand

Power (Input)

240V, 380V, 415V, 440V

Raw Material Moisture content

1%~30%

Recent Product
Product Gallery

Our Services

From Process Engineering to Complete Production Information-Based Design & Supply

24/7 Support

Our sales team will respond to your inquiries within 24 working hours, and after-sales support is assured within 48 hours.

Online&Site Tutorials

Process operations and technical documents are available for handover and ensure that each operator receives them prior to system unit operation.

Powerful Design Capacities

Starting from the initial technical specifications and process flow to meet your expected target output quality, to the final approved performance is guaranteed.

Strict Quality Control

Sophisticated equipment manufacturing, strict production quality control, inspection, and testing prior to delivery.

Quality Assurance Statement

We stand behind our products with a comprehensive warranty, covering any defects in materials and workmanship. Our dedicated customer service team is always ready to assist with any concerns, offering solutions and support to ensure your complete satisfaction.

On Site Commissioning

Engineers with 10+ years of experience will be dispatched upon request to support the start-up and commissioning work on-site.

Get A Precise Solution

We will contact you within two working days, please pay attention to the email with the suffix”@greatwallcontrol.com”